Dependability and Durability: That’s Magaldi for STEAG Mindanao Power Plant!

11 March 2024

Dependability and Durability: That’s Magaldi for STEAG Mindanao Power Plant!

Magaldi recently paid a visit to the Mindanao coal-fired power plant in the Philippines, where two MAC® systems for dry bottom ash extraction have been operating since 2006.
Magaldi equipment has been running flawlessly and with minimum maintenance requirements for 17 years, so much so that the original belt – the Superbelt® - has never needed replacement.
This achievement is a testament to the quality and engineering excellence that defines Magaldi.

We take great pride in driving sustainable solutions for the power industry while continuously raising the bar for performance, reliability, and durability.
Discover more about our environmentally friendly solutions for the power industry at: https://www.magaldi.com/en/coal-fired-power-plants

Let’s set together new benchmarks for sustainability.

 

News

AUTOMATIC CASTING SORTING - Safety and Operational Reliability for Foundry Resilience

09 April 2026

Read More

News

ENGINEERING OUT RCS RISK - The Role of Vibration-Free Handling

09 April 2026

Read More

News

SCRAP DRYING & PREHEATING - Mitigating Operational Hazards and Enhancing Melt Shop Efficiency

09 April 2026

Read More

News

People First: Waupaca’s Blueprint for a Modern, Safer Foundry

08 April 2026

Struggling with noise and dust? Read the full article and the exclusive testimonials from the Waupaca team in the March issue of Modern Casting to see how the US foundry transformed a high-risk sorting area into a safer, quieter environment - reducing silica exposure by 98% - creating a workplace where operators actually want to work.

Read More