STEEL BELT CONVEYORS FOR SEVERE CONDITIONS since 1929
Magaldi technologies mechanically handle bottom and fly ashes in a dry way performing at the highest level of reliability and safety, improving overall plant efficiency and reducing the environmental impact of the solid fuel power generation industry.
Year | End User | Plant | General Data | Solution | More | |
---|---|---|---|---|---|---|
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #5 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #4 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #3 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #2 |
Unit size: 37.5 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #4 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #3 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #2 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #1 |
Unit size: 820 MWe |
CASE STUDY | |
2016 | Romania | COMPLEXUL ENERGETIC OLTENIA | ISALNITA 7A |
Unit size: 165 MWe |
CASE STUDY | |
2015 | Turkey | CENAL ELEKTRİK ÜRETİM A.Ş. | KARABIGA #2 |
Unit size: 660 MWe |
CASE STUDY | |
2015 | Turkey | CENAL ELEKTRİK ÜRETİM A.Ş. | KARABIGA #1 |
Unit size: 660 MWe |
CASE STUDY | |
2015 | Japan | CHUBU ELECTRIC+TEPCO | HITACHINAKA #3 |
Unit size: 650 MWe |
CASE STUDY | |
2015 | India | HMEL | GGSR Captive P.P. #2 |
Unit size: 100 MWe |
CASE STUDY | |
2015 | India | HMEL | GGSR Captive P.P. #1 |
Unit size: 100 MWe |
CASE STUDY | |
2013 | Mongolia | Ulaan Baatar Thermal Power Plant #4 | UNIT #7 |
Unit size: 80 MWe |
CASE STUDY | |
2013 | South Korea | STX Heavy Industries | BUKPYEONG #2 |
Unit size: 600 MWe |
CASE STUDY | |
2013 | South Korea | STX Heavy Industries | BUKPYEONG #1 |
Unit size: 600 MWe |
CASE STUDY | |
2013 | Russia | JSC "E.ON Russia" | BEREZOVSKAYA GRES #3 |
Unit size: 800 MWe |
CASE STUDY | |
2012 | Mongolia | Ulaan Baatar Thermal Power Plant #4 | UNIT #8 |
Unit size: 80 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #3 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #2 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #1 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | South Korea | EWP (Korea East-West Power) | DANGJIN #10 |
Unit size: 1,000 MWe |
CASE STUDY | |
2011 | South Korea | EWP (Korea East-West Power) | DANGJIN #9 |
Unit size: 1,000 MWe |
CASE STUDY | |
2011 | Germany | RWE Power AG | GERSTEINWERK #K |
Unit size: 770 MWe |
CASE STUDY | |
2010 | Czech Republic | PLZEŇSKÁ TEPLÁRENSKÁ, a.s. | PLZEŇ K4 |
Unit size: 60 MWe |
CASE STUDY | |
2009 | Czech Republic | PLZEŇSKÁ TEPLÁRENSKÁ, a.s. | PLZEŇ K5 |
Unit size: 60 MWe |
CASE STUDY | |
2009 | Chile | SUEZ ENERGY ANDINO S.A. | CENTRAL TERMOELECTRICA ANDINA #2 |
Unit size: 165 MWe |
Fluidized Bed Ash Handling in FBC Power Plants Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials |
CASE STUDY |
2009 | Chile | SUEZ ENERGY ANDINO S.A. | CENTRAL TERMOELECTRICA ANDINA #1 |
Unit size: 165 MWe |
Fluidized Bed Ash Handling in FBC Power Plants Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials |
CASE STUDY |
2009 | South Korea | KOSEP (Korea South-East Power) | YEOSU #2 |
Unit size: 340 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #4 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #3 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #2 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #1 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | Germany | RWE Power AG | WESTFALEN #E |
Unit size: 800 MWe |
CASE STUDY | |
2008 | Germany | RWE Power AG | WESTFALEN #D |
Unit size: 800 MWe |
CASE STUDY | |
2008 | Germany | EVONIK STEAG | WALSUM #10 |
Unit size: 750 MWe |
CASE STUDY | |
2008 | Chile | ENDESA | BOCAMINA #1 |
Unit size: 128 MWe |
CASE STUDY | |
2007 | Australia | MILLMERRAN OPERATING COMPANY | MILLMERRAN #2 |
Unit size: 426 MWe |
CASE STUDY | |
2007 | Australia | MILLMERRAN OPERATING COMPANY | MILLMERRAN #1 |
Unit size: 426 MWe |
CASE STUDY | |
2007 | USA | BASIN ELECTRIC CORP. | DRY FORK #2 |
Unit size: 385 MWe |
CASE STUDY | |
2007 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | PACIFICO |
Unit size: 651 MWe |
CASE STUDY | |
2006 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #2 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #3 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #4 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #3 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #2 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #1 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | India | THE WEST BENGAL POWER DEVELOPMENT Co. Ltd. | Durgapur #7 |
Unit size: 300 MWe |
CASE STUDY | |
2004 | Philippines | STEAG State Power Inc. | MINDANAO #2 |
Unit size: 116 MWe |
CASE STUDY | |
2004 | Philippines | STEAG State Power Inc. | MINDANAO #1 |
Unit size: 116 MWe |
CASE STUDY | |
2003 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #4 |
Unit size: 135 MWe |
CASE STUDY | |
2003 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #3 |
Unit size: 135 MWe |
CASE STUDY | |
2003 | Italy | EP PRODUZIONE | FIUME SANTO #4 |
Unit size: 320 MWe |
CASE STUDY | |
2003 | Italy | EP PRODUZIONE | FIUME SANTO #3 |
Unit size: 320 MWe |
CASE STUDY | |
2002 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #2 |
Unit size: 135 MWe |
CASE STUDY | |
2002 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #1 |
Unit size: 135 MWe |
CASE STUDY | |
2001 | Turkey | ISKENDERUN ENERJI URETIM | ISKENDERUN #2 |
Unit size: 605 MWe |
CASE STUDY | |
2001 | Turkey | ISKENDERUN ENERJI URETIM | ISKENDERUN #1 |
Unit size: 605 MWe |
CASE STUDY | |
2000 | Poland | ZESPOL ELEKTRO. BYDGOSZCZ | BYDGOSZCZ #K4 |
Unit size: 65 MWe |
CASE STUDY | |
2000 | Poland | ZESPOL ELEKTRO. BYDGOSZCZ | BYDGOSZCZ #K3 |
Unit size: 65 MWe |
CASE STUDY | |
1998 | Italy | ENI | GELA #3 |
Unit size: 150 MWe |
CASE STUDY | |
1998 | Italy | ENI | GELA #2 |
Unit size: 150 MWe |
CASE STUDY | |
1998 | Italy | ENI | GELA #1 |
Unit size: 150 MWe |
CASE STUDY | |
1996 | Chile | EDELNOR | MEJILLONES #2 |
Unit size: 150 MWe Project type: Greenfield Ash rate: 3 t/h Ash rate max: 4 t/h Burned fuel: Coal Boiler manufacturer: B&W / ANSALDO |
CASE STUDY | |
1994 | Greece | PUBLIC POWER CORP. | PTOLEMAIS #4 |
Unit size: 300 MWe |
CASE STUDY | |
1994 | Chile | EDELNOR | MEJILLONES #1 |
Unit size: 150 MWe |
CASE STUDY | |
1993 | Italy | ENEL | FUSINA #4 |
Unit size: 320 MWe |
CASE STUDY | |
1993 | USA | FLORIDA POWER CORP. | CRYSTAL RIVER #2 |
Unit size: 500 MWe |
CASE STUDY | |
1993 | Italy | ENEL | FUSINA #3 |
Unit size: 320 MWe |
CASE STUDY | |
1991 | Italy | ENEL | FUSINA #2 |
Unit size: 160 MWe |
CASE STUDY | |
1991 | Italy | ENEL | FUSINA #1 |
Unit size: 160 MWe |
CASE STUDY | |
2019 | Japan | Hokuren Federation of Agricultural Cooperative | Nakashari beat sugar factory |
Unit size: 39 MWe |
||
2019 | Bangladesh | Coal Power Generation Company Bangladesh Limited (CPGCBL) | MATARBARI #2 |
Unit size: 600 MWe |
||
2019 | Bangladesh | Coal Power Generation Company Bangladesh Limited (CPGCBL) | MATARBARI #1 |
Unit size: 600 MWe |
||
2019 | South Korea | Gangneung Eco Power Co., Ltd. (GEP) | GANGNEUNG #2 |
Unit size: 1040 MWe |
||
2019 | South Korea | Gangneung Eco Power Co., Ltd. (GEP) | GANGNEUNG #1 |
Unit size: 1040 MWe |
||
2018 | USA | Alliant Energy/Interstate Power and Light Company | OTTUMWA #1 |
Unit size: 726 MWe |
||
2018 | Japan | SHIKOKU ELECTRIC POWER Co., Inc. | SAIJO #1 |
Unit size: 500 MWe |
||
2018 | Mexico | CFE Generaciòn II | CARBON II #2 |
Unit size: 350 MWe |
||
2018 | Mexico | CFE Generaciòn II | CARBON II #1 |
Unit size: 350 MWe |
||
2017 | South Korea | Goseong Green Power Co., Ltd. | GOSEONG #2 |
Unit size: 1040 MWe |
||
2017 | South Korea | Goseong Green Power Co., Ltd. | GOSEONG #1 |
Unit size: 1040 MWe |
||
2017 | South Korea | KOMIPO (Korea Midland Power) | SHINSEOCHEON #1 |
Unit size: 1020 MWe |
||
2017 | Japan | J-POWER Co. Ltd. | TAKEHARA #1 |
Unit size: 600 MWe |
||
2016 | Japan | KOBE STEEL Ltd. | SHINKO KOBE #4 |
Unit size: 650 MWe |
||
2016 | Japan | KOBE STEEL Ltd. | SHINKO KOBE #3 |
Unit size: 650 MWe |
||
2016 | Japan | Tohoku Electric Power Co. Inc. | NOSHIRO #3 |
Unit size: 600 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #3 |
Unit size: 150 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #2 |
Unit size: 150 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #1 |
Unit size: 150 MWe |
||
2015 | Japan | KASHIMA POWER | KASHIMA #2 |
Unit size: 645 MWe |
||
2015 | Chile | E-CL (GDF SUEZ) | RED DRAGON #7 |
Unit size: 375 MWe |
||
2015 | Slovakia | U. S. Steel Košice, s.r.o. | K7 |
Unit size: 226 MWth |
||
2015 | Slovakia | U. S. Steel Košice, s.r.o. | K6 |
Unit size: 226 MWth |
||
2014 | South Korea | KOWEPO (Korea Western Power) | TAEAN #10 |
Unit size: 1050 MWe |
||
2014 | South Korea | KOWEPO (Korea Western Power) | TAEAN #9 |
Unit size: 1050 MWe |
||
2013 | South Korea | KOMIPO (Korea Midland Power) | SHINBORYONG #2 |
Unit size: 1000 MWe |
||
2013 | South Korea | KOMIPO (Korea Midland Power) | SHINBORYONG #1 |
Unit size: 1000 MWe |
||
2013 | South Korea | KOSEP (Korea South-East Power) | YEOSU #1 |
Unit size: 340 MWe |
||
2013 | India | OPG POWER | GUMMIDIPOONDI #4 |
Unit size:160 MWe |
||
2013 | India | OPG POWER | GUJARAT #2 |
Unit size:150 MWe |
||
2013 | India | OPG POWER | GUJARAT #1 |
Unit size:150 MWe |
||
2012 | India | SKS | RAIGARH #2 |
Unit size: 300 MWe |
||
2012 | India | SKS | RAIGARH #1 |
Unit size: 300 MWe |
||
2012 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #6 |
Unit size: 870 MWe |
||
2012 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #5 |
Unit size: 870 MWe |
||
2012 | India | THE WEST BENGAL POWER DEVELOPMENT Co. | Durgapur #8 |
Unit size: 250 MWe |
Dry Bottom Ash Handling in PCF Power Plants burning high-ash content coals |
|
2011 | India | HINDALCO | ADITYA ALUMINIUM #6 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #5 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #4 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #3 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #2 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #1 |
Unit size: 150 MWe |
||
2011 | India | OPG POWER | GUMMIDIPOONDI #3 |
Unit size: 80 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #2 |
Unit size: 360 MWe |
Extracción, enfriamiento y transporte en seco de cenizas de fondo de calderas de carbón pulverizado |
|
2010 | India | SARDA Metals & Alloys | VISHAKPATNAM ANDRA PRADESH #1 |
Unit size: 80 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #4 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #3 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #2 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #1 |
Unit size: 360 MWe |
||
2010 | India | GMR Energy | WARORA, MAHARASHTRA #2 |
Unit size: 300 MWe |
||
2010 | India | GMR Energy | WARORA, MAHARASHTRA #1 |
Unit size: 300 MWe |
||
2009 | The Netherlands | ELECTRABEL GDF Suez | ROTTERDAM |
Unit size: 800 MWe |
||
2009 | The Netherlands | RWE Power AG | EEMSHAVEN #2 |
Unit size: 800 MWe |
||
2009 | The Netherlands | RWE Power AG | EEMSHAVEN #1 |
Unit size: 800 MWe |
||
2008 | Chile | COLBUN S.A. | CORONEL #1 |
Unit size: 350 MWe |
||
2008 | Germany | ELECTRABEL GDF Suez | WILHELMSHAVEN #1 |
Unit size: 800 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #4 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #3 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #2 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #1 |
Unit size: 660 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #4 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #3 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #2 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #1 |
Unit size: 430 MWe |
||
2008 | India | OPG POWER | GUMMIDIPOONDI #2 |
Unit size: 80 MWe |
||
2008 | India | OPG POWER | GUMMIDIPOONDI #1 |
Unit size: 80 MWe |
||
2008 | Brazil | EDB-MPX | ITAQUI #1 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #3 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #2 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #1 |
Unit size: 360 MWe |
||
2008 | Chile | ENDESA | BOCAMINA #2 |
Unit size: 350 MWe |
||
2007 | Spain | GESA | ALCUDIA #2 |
Unit size: 125 MWe |
||
2007 | Spain | GESA | ALCUDIA #1 |
Unit size: 125 MWe |
||
2007 | Portugal | EDP | SINES #3 |
Unit size: 314 MWe |
||
2007 | Australia | THE GRIFFIN GROUP | BLUEWATERS #2 |
Unit size: 208 MWe |
||
2007 | Mexico | CERREY S.A. DE C.V. | ZACATECAS #5 |
Unit size: 129 MWe |
||
2007 | Australia | THE GRIFFIN GROUP | BLUEWATERS #1 |
Unit size: 208 MWe |
||
2006 | Spain | ENDESA | ALMERIA #1 |
Unit size: 577 MWe |
||
2006 | Japan | THE KANSAI ELECTRIC POWER Co. | MAIZURU #2 |
Unit size: 900 MWe |
||
2006 | Portugal | EDP | SINES #1 |
Unit size: 314 MWe |
||
2006 | France | SNET / E.ON | EMILE HUCHET |
Unit size: 125 MWe |
||
2006 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #4 |
Unit size: 870 MWe |
||
2006 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #3 |
Unit size: 870 MWe |
||
2005 | South Korea | KOSPO (Korea Southern Power) | HADONG #8 |
Unit size: 500 MWe |
||
2005 | South Korea | KOSPO (Korea Southern Power) | HADONG #7 |
Unit size: 500 MWe |
||
2005 | Japan | J-POWER | ISOGO #2 |
Unit size: 600 MWe |
||
2005 | Spain | HC Energia / EDP | ABOÑO #2 |
Unit size: 556 MWe |
||
2005 | Portugal | EDP | SINES #2 |
Unit size: 314 MWe |
||
2004 | South Korea | KOWEPO (Korea Western Power) | TAEAN #8 |
Unit size: 500 MWe |
||
2004 | South Korea | KOWEPO (Korea Western Power) | TAEAN #7 |
Unit size: 500 MWe |
||
2004 | Japan | SUMITOMO METAL INDUSTRIES | KASHIMA STEELWORKS |
Unit size: 507 MWe |
||
2004 | Portugal | EDP | SINES #4 |
Unit size: 314 MWe |
||
2004 | Australia | CS ENERGY | CALLIDE B #2 |
Unit size: 350 MWe |
||
2004 | Australia | CS ENERGY | CALLIDE B #1 |
Unit size: 350 MWe |
||
2003 | People's Rep. of China | SP POWER DEVELOPMENT Co. | DATONG #6 |
Unit size: 200 MWe |
||
2003 | Japan | NIPPON BEET SUGAR MFG Co. | MEMURO |
Unit size: 15 MWe |
||
2003 | Australia | DELTA ELECTRICITY | WALLERAWANG #8 |
Unit size: 500 MWe |
||
2003 | Australia | DELTA ELECTRICITY | WALLERAWANG #7 |
Unit size: 500 MWe |
||
2003 | People's Rep. of China | CHANGCHUN SECOND HEAT & POWER Co. | CHANGCHUN #2 |
Unit size: 200 MWe |
||
2003 | People's Rep. of China | CHANGCHUN SECOND HEAT & POWER Co. | CHANGCHUN #1 |
Unit size: 200 MWe |
||
2002 | Italy | ENEL | GENOVA #9 |
Unit size: 160 MWe |
||
2002 | Spain | E.ON SPAIN | LOS BARRIOS #1 |
Unit size: 550 MWe |
||
2001 | Italy | ENEL | GENOVA #8 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #7 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #6 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #5 |
Unit size: 35 MWe |
||
2001 | People's Rep. of China | SICHUAN TUOPAI HEAT & POWER | TUOPAI #2 |
Unit size: 75 MWe |
||
2001 | People's Rep. of China | SICHUAN TUOPAI HEAT & POWER | TUOPAI #1 |
Unit size: 75 MWe |
||
2000 | Japan | KOBE STEEL | KOBE #2 |
Unit size: 700 MWe |
||
1999 | Japan | HOKKAIDO ELECTRIC POWER CORP. | TOMATOH-ATSUMA #4 |
Unit size: 700 MWe |
||
1999 | Japan | KOBE STEEL | KOBE #1 |
Unit size: 700 MWe |
||
1998 | Canada | NOVA SCOTIA POWER INC. | TRENTON #5 |
Unit size: 160 MWe |
||
1998 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | CTE Presidente Plutarco Elìas Calles #2 |
Unit size: 350 MWe |
||
1998 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | CTE Presidente Plutarco Elìas Calles #1 |
Unit size: 350 MWe |
||
1998 | Italy | ENEL | LA SPEZIA #3 |
Unit size: 600 MWe |
||
1997 | People's Rep. of China | SANHE ELECTRIC POWER | SANHE #2 |
Unit size: 350 MWe |
||
1997 | People's Rep. of China | SANHE ELECTRIC POWER | SANHE #1 |
Unit size: 350 MWe |
||
1997 | Czech Republic | ENERGETIKA TRINEC | TRINEC #k14 |
Unit size: 60 MWe |
||
1996 | Colombia | STEAG | PAIPA #4 | Unit size: 165 MWe Project type: Greenfield Ash rate: 2.5 t/h Ash rate max: 9 t/h Burned fuel: Coal Boiler manufacturer: B&W | ||
1995 | Italy | ENEL | SULCIS #3 |
Unit size: 240 MWe |
||
1995 | Italy | TIRRENO POWER | VADO LIGURE #4 |
Unit size: 320 MWe |
||
1995 | Italy | TIRRENO POWER | VADO LIGURE #3 |
Unit size: 320 MWe |
||
1995 | Spain | ENDESA | ALMERIA #2 |
Unit size: 550 MWe |
||
1994 | Spain | GESA | ALCUDIA #4 |
Unit size: 130 MWe |
||
1994 | Spain | GESA | ALCUDIA #3 |
Unit size: 130 MWe |
||
1991 | Italy | A2A | MONFALCONE #2 |
Unit size: 160 MWe |
||
1990 | Italy | ENEL | BASTARDO #2 |
Unit size: 75 MWe |
||
1990 | Italy | A2A | MONFALCONE #1 |
Unit size: 160 MWe |
||
1989 | Italy | ENEL | BASTARDO #1 |
Unit size: 75 MWe |
||
1985 | Italy | ENEL | PIETRAFITTA #2 |
Unit size: 35 MWe |
||
1985 | Italy | ENEL | PIETRAFITTA #1 |
Unit size: 35 MWe |
Year | Country | End User | Plant | General Data | Solution | More |
2019 | Japan | Hokuren Federation of Agricultural Cooperative | Nakashari beat sugar factory |
Unit size: 39 MWe |
||
2019 | Bangladesh | Coal Power Generation Company Bangladesh Limited (CPGCBL) | MATARBARI #2 |
Unit size: 600 MWe |
||
2019 | Bangladesh | Coal Power Generation Company Bangladesh Limited (CPGCBL) | MATARBARI #1 |
Unit size: 600 MWe |
||
2019 | South Korea | Gangneung Eco Power Co., Ltd. (GEP) | GANGNEUNG #2 |
Unit size: 1040 MWe |
||
2019 | South Korea | Gangneung Eco Power Co., Ltd. (GEP) | GANGNEUNG #1 |
Unit size: 1040 MWe |
||
2018 | USA | Alliant Energy/Interstate Power and Light Company | OTTUMWA #1 |
Unit size: 726 MWe |
||
2018 | Japan | SHIKOKU ELECTRIC POWER Co., Inc. | SAIJO #1 |
Unit size: 500 MWe |
||
2018 | Mexico | CFE Generaciòn II | CARBON II #2 |
Unit size: 350 MWe |
||
2018 | Mexico | CFE Generaciòn II | CARBON II #1 |
Unit size: 350 MWe |
||
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #5 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | South Korea | Goseong Green Power Co., Ltd. | GOSEONG #2 |
Unit size: 1040 MWe |
||
2017 | South Korea | Goseong Green Power Co., Ltd. | GOSEONG #1 |
Unit size: 1040 MWe |
||
2017 | South Korea | KOMIPO (Korea Midland Power) | SHINSEOCHEON #1 |
Unit size: 1020 MWe |
||
2017 | Japan | J-POWER Co. Ltd. | TAKEHARA #1 |
Unit size: 600 MWe |
||
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #4 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #3 |
Unit size: 66 MWe |
CASE STUDY | |
2017 | Colombia | EMGESA S.A. ESP | TERMOZIPA #2 |
Unit size: 37.5 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #4 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #3 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #2 |
Unit size: 915 MWe |
CASE STUDY | |
2016 | USA | GEORGIA POWER - SOUTHERN COMPANY | SCHERER #1 |
Unit size: 820 MWe |
CASE STUDY | |
2016 | Romania | COMPLEXUL ENERGETIC OLTENIA | ISALNITA 7A |
Unit size: 165 MWe |
CASE STUDY | |
2016 | Japan | KOBE STEEL Ltd. | SHINKO KOBE #4 |
Unit size: 650 MWe |
||
2016 | Japan | KOBE STEEL Ltd. | SHINKO KOBE #3 |
Unit size: 650 MWe |
||
2016 | Japan | Tohoku Electric Power Co. Inc. | NOSHIRO #3 |
Unit size: 600 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #3 |
Unit size: 150 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #2 |
Unit size: 150 MWe |
||
2015 | Turkey | ENERJI SA | TUFANBEYLI #1 |
Unit size: 150 MWe |
||
2015 | Japan | KASHIMA POWER | KASHIMA #2 |
Unit size: 645 MWe |
||
2015 | Chile | E-CL (GDF SUEZ) | RED DRAGON #7 |
Unit size: 375 MWe |
||
2015 | Turkey | CENAL ELEKTRİK ÜRETİM A.Ş. | KARABIGA #2 |
Unit size: 660 MWe |
CASE STUDY | |
2015 | Turkey | CENAL ELEKTRİK ÜRETİM A.Ş. | KARABIGA #1 |
Unit size: 660 MWe |
CASE STUDY | |
2015 | Slovakia | U. S. Steel Košice, s.r.o. | K7 |
Unit size: 226 MWth |
||
2015 | Slovakia | U. S. Steel Košice, s.r.o. | K6 |
Unit size: 226 MWth |
||
2015 | Japan | CHUBU ELECTRIC+TEPCO | HITACHINAKA #3 |
Unit size: 650 MWe |
CASE STUDY | |
2015 | India | HMEL | GGSR Captive P.P. #2 |
Unit size: 100 MWe |
CASE STUDY | |
2015 | India | HMEL | GGSR Captive P.P. #1 |
Unit size: 100 MWe |
CASE STUDY | |
2014 | South Korea | KOWEPO (Korea Western Power) | TAEAN #10 |
Unit size: 1050 MWe |
||
2014 | South Korea | KOWEPO (Korea Western Power) | TAEAN #9 |
Unit size: 1050 MWe |
||
2013 | South Korea | KOMIPO (Korea Midland Power) | SHINBORYONG #2 |
Unit size: 1000 MWe |
||
2013 | South Korea | KOMIPO (Korea Midland Power) | SHINBORYONG #1 |
Unit size: 1000 MWe |
||
2013 | South Korea | KOSEP (Korea South-East Power) | YEOSU #1 |
Unit size: 340 MWe |
||
2013 | Mongolia | Ulaan Baatar Thermal Power Plant #4 | UNIT #7 |
Unit size: 80 MWe |
CASE STUDY | |
2013 | South Korea | STX Heavy Industries | BUKPYEONG #2 |
Unit size: 600 MWe |
CASE STUDY | |
2013 | South Korea | STX Heavy Industries | BUKPYEONG #1 |
Unit size: 600 MWe |
CASE STUDY | |
2013 | India | OPG POWER | GUMMIDIPOONDI #4 |
Unit size:160 MWe |
||
2013 | India | OPG POWER | GUJARAT #2 |
Unit size:150 MWe |
||
2013 | India | OPG POWER | GUJARAT #1 |
Unit size:150 MWe |
||
2013 | Russia | JSC "E.ON Russia" | BEREZOVSKAYA GRES #3 |
Unit size: 800 MWe |
CASE STUDY | |
2012 | India | SKS | RAIGARH #2 |
Unit size: 300 MWe |
||
2012 | India | SKS | RAIGARH #1 |
Unit size: 300 MWe |
||
2012 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #6 |
Unit size: 870 MWe |
||
2012 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #5 |
Unit size: 870 MWe |
||
2012 | India | THE WEST BENGAL POWER DEVELOPMENT Co. | Durgapur #8 |
Unit size: 250 MWe |
Dry Bottom Ash Handling in PCF Power Plants burning high-ash content coals |
|
2012 | Mongolia | Ulaan Baatar Thermal Power Plant #4 | UNIT #8 |
Unit size: 80 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #3 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #2 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | Taiwan | Taiwan Power Company (TPC) | LINKOU #1 |
Unit size: 800 MWe |
CASE STUDY | |
2011 | South Korea | EWP (Korea East-West Power) | DANGJIN #10 |
Unit size: 1,000 MWe |
CASE STUDY | |
2011 | South Korea | EWP (Korea East-West Power) | DANGJIN #9 |
Unit size: 1,000 MWe |
CASE STUDY | |
2011 | India | HINDALCO | ADITYA ALUMINIUM #6 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #5 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #4 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #3 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #2 |
Unit size: 150 MWe |
||
2011 | India | HINDALCO | ADITYA ALUMINIUM #1 |
Unit size: 150 MWe |
||
2011 | Germany | RWE Power AG | GERSTEINWERK #K |
Unit size: 770 MWe |
CASE STUDY | |
2011 | India | OPG POWER | GUMMIDIPOONDI #3 |
Unit size: 80 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #2 |
Unit size: 360 MWe |
Extracción, enfriamiento y transporte en seco de cenizas de fondo de calderas de carbón pulverizado |
|
2010 | Czech Republic | PLZEŇSKÁ TEPLÁRENSKÁ, a.s. | PLZEŇ K4 |
Unit size: 60 MWe |
CASE STUDY | |
2010 | India | SARDA Metals & Alloys | VISHAKPATNAM ANDRA PRADESH #1 |
Unit size: 80 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #4 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #3 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #2 |
Unit size: 360 MWe |
||
2010 | India | R.K.M. PowerGen | UCCHPINDA, CHHATTISGARH #1 |
Unit size: 360 MWe |
||
2010 | India | GMR Energy | WARORA, MAHARASHTRA #2 |
Unit size: 300 MWe |
||
2010 | India | GMR Energy | WARORA, MAHARASHTRA #1 |
Unit size: 300 MWe |
||
2009 | Czech Republic | PLZEŇSKÁ TEPLÁRENSKÁ, a.s. | PLZEŇ K5 |
Unit size: 60 MWe |
CASE STUDY | |
2009 | Chile | SUEZ ENERGY ANDINO S.A. | CENTRAL TERMOELECTRICA ANDINA #2 |
Unit size: 165 MWe |
Fluidized Bed Ash Handling in FBC Power Plants Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials |
CASE STUDY |
2009 | Chile | SUEZ ENERGY ANDINO S.A. | CENTRAL TERMOELECTRICA ANDINA #1 |
Unit size: 165 MWe |
Fluidized Bed Ash Handling in FBC Power Plants Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials |
CASE STUDY |
2009 | The Netherlands | ELECTRABEL GDF Suez | ROTTERDAM |
Unit size: 800 MWe |
||
2009 | The Netherlands | RWE Power AG | EEMSHAVEN #2 |
Unit size: 800 MWe |
||
2009 | The Netherlands | RWE Power AG | EEMSHAVEN #1 |
Unit size: 800 MWe |
||
2009 | South Korea | KOSEP (Korea South-East Power) | YEOSU #2 |
Unit size: 340 MWe |
CASE STUDY | |
2008 | Chile | COLBUN S.A. | CORONEL #1 |
Unit size: 350 MWe |
||
2008 | Germany | ELECTRABEL GDF Suez | WILHELMSHAVEN #1 |
Unit size: 800 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #4 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #3 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #2 |
Unit size: 660 MWe |
||
2008 | Australia | ERARING ENERGY | ERARING #1 |
Unit size: 660 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #4 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #3 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #2 |
Unit size: 430 MWe |
||
2008 | Australia | MACQUARIE GENERATION | LIDDELL #1 |
Unit size: 430 MWe |
||
2008 | India | OPG POWER | GUMMIDIPOONDI #2 |
Unit size: 80 MWe |
||
2008 | India | OPG POWER | GUMMIDIPOONDI #1 |
Unit size: 80 MWe |
||
2008 | Brazil | EDB-MPX | ITAQUI #1 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #3 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #2 |
Unit size: 360 MWe |
||
2008 | Brazil | EDB-MPX | PECEM #1 |
Unit size: 360 MWe |
||
2008 | India | JSW Energy | RATNAGIRI #4 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #3 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #2 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | India | JSW Energy | RATNAGIRI #1 |
Unit size: 300 MWe |
CASE STUDY | |
2008 | Chile | ENDESA | BOCAMINA #2 |
Unit size: 350 MWe |
||
2008 | Germany | RWE Power AG | WESTFALEN #E |
Unit size: 800 MWe |
CASE STUDY | |
2008 | Germany | RWE Power AG | WESTFALEN #D |
Unit size: 800 MWe |
CASE STUDY | |
2008 | Germany | EVONIK STEAG | WALSUM #10 |
Unit size: 750 MWe |
CASE STUDY | |
2008 | Chile | ENDESA | BOCAMINA #1 |
Unit size: 128 MWe |
CASE STUDY | |
2007 | Spain | GESA | ALCUDIA #2 |
Unit size: 125 MWe |
||
2007 | Spain | GESA | ALCUDIA #1 |
Unit size: 125 MWe |
||
2007 | Australia | MILLMERRAN OPERATING COMPANY | MILLMERRAN #2 |
Unit size: 426 MWe |
CASE STUDY | |
2007 | Australia | MILLMERRAN OPERATING COMPANY | MILLMERRAN #1 |
Unit size: 426 MWe |
CASE STUDY | |
2007 | USA | BASIN ELECTRIC CORP. | DRY FORK #2 |
Unit size: 385 MWe |
CASE STUDY | |
2007 | Portugal | EDP | SINES #3 |
Unit size: 314 MWe |
||
2007 | Australia | THE GRIFFIN GROUP | BLUEWATERS #2 |
Unit size: 208 MWe |
||
2007 | Mexico | CERREY S.A. DE C.V. | ZACATECAS #5 |
Unit size: 129 MWe |
||
2007 | Australia | THE GRIFFIN GROUP | BLUEWATERS #1 |
Unit size: 208 MWe |
||
2007 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | PACIFICO |
Unit size: 651 MWe |
CASE STUDY | |
2006 | Spain | ENDESA | ALMERIA #1 |
Unit size: 577 MWe |
||
2006 | Japan | THE KANSAI ELECTRIC POWER Co. | MAIZURU #2 |
Unit size: 900 MWe |
||
2006 | Portugal | EDP | SINES #1 |
Unit size: 314 MWe |
||
2006 | France | SNET / E.ON | EMILE HUCHET |
Unit size: 125 MWe |
||
2006 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #4 |
Unit size: 870 MWe |
||
2006 | South Korea | KOSEP (Korea South-East Power) | YONGHUNG #3 |
Unit size: 870 MWe |
||
2006 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #2 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | South Korea | KOSPO (Korea Southern Power) | HADONG #8 |
Unit size: 500 MWe |
||
2005 | South Korea | KOSPO (Korea Southern Power) | HADONG #7 |
Unit size: 500 MWe |
||
2005 | Japan | J-POWER | ISOGO #2 |
Unit size: 600 MWe |
||
2005 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #3 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #4 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #3 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | Italy | ENEL | TORREVALDALIGA NORD #2 |
Unit size: 660 MWe |
CASE STUDY | |
2005 | Spain | HC Energia / EDP | ABOÑO #2 |
Unit size: 556 MWe |
||
2005 | People's Rep. of China | BAOSTEEL - Baoshan Iron & Steel Co. | BAOSHAN #1 |
Unit size: 350 MWe |
CASE STUDY | |
2005 | Portugal | EDP | SINES #2 |
Unit size: 314 MWe |
||
2005 | India | THE WEST BENGAL POWER DEVELOPMENT Co. Ltd. | Durgapur #7 |
Unit size: 300 MWe |
CASE STUDY | |
2004 | South Korea | KOWEPO (Korea Western Power) | TAEAN #8 |
Unit size: 500 MWe |
||
2004 | South Korea | KOWEPO (Korea Western Power) | TAEAN #7 |
Unit size: 500 MWe |
||
2004 | Philippines | STEAG State Power Inc. | MINDANAO #2 |
Unit size: 116 MWe |
CASE STUDY | |
2004 | Philippines | STEAG State Power Inc. | MINDANAO #1 |
Unit size: 116 MWe |
CASE STUDY | |
2004 | Japan | SUMITOMO METAL INDUSTRIES | KASHIMA STEELWORKS |
Unit size: 507 MWe |
||
2004 | Portugal | EDP | SINES #4 |
Unit size: 314 MWe |
||
2004 | Australia | CS ENERGY | CALLIDE B #2 |
Unit size: 350 MWe |
||
2004 | Australia | CS ENERGY | CALLIDE B #1 |
Unit size: 350 MWe |
||
2003 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #4 |
Unit size: 135 MWe |
CASE STUDY | |
2003 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #3 |
Unit size: 135 MWe |
CASE STUDY | |
2003 | People's Rep. of China | SP POWER DEVELOPMENT Co. | DATONG #6 |
Unit size: 200 MWe |
||
2003 | Japan | NIPPON BEET SUGAR MFG Co. | MEMURO |
Unit size: 15 MWe |
||
2003 | Australia | DELTA ELECTRICITY | WALLERAWANG #8 |
Unit size: 500 MWe |
||
2003 | Australia | DELTA ELECTRICITY | WALLERAWANG #7 |
Unit size: 500 MWe |
||
2003 | People's Rep. of China | CHANGCHUN SECOND HEAT & POWER Co. | CHANGCHUN #2 |
Unit size: 200 MWe |
||
2003 | People's Rep. of China | CHANGCHUN SECOND HEAT & POWER Co. | CHANGCHUN #1 |
Unit size: 200 MWe |
||
2003 | Italy | EP PRODUZIONE | FIUME SANTO #4 |
Unit size: 320 MWe |
CASE STUDY | |
2003 | Italy | EP PRODUZIONE | FIUME SANTO #3 |
Unit size: 320 MWe |
CASE STUDY | |
2002 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #2 |
Unit size: 135 MWe |
CASE STUDY | |
2002 | People's Rep. of China | JIANGSU PROVINCIAL ELECTRIC POWER Co. | JIAWANG #1 |
Unit size: 135 MWe |
CASE STUDY | |
2002 | Italy | ENEL | GENOVA #9 |
Unit size: 160 MWe |
||
2002 | Spain | E.ON SPAIN | LOS BARRIOS #1 |
Unit size: 550 MWe |
||
2001 | Italy | ENEL | GENOVA #8 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #7 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #6 |
Unit size: 35 MWe |
||
2001 | Italy | ENEL | GENOVA #5 |
Unit size: 35 MWe |
||
2001 | People's Rep. of China | SICHUAN TUOPAI HEAT & POWER | TUOPAI #2 |
Unit size: 75 MWe |
||
2001 | People's Rep. of China | SICHUAN TUOPAI HEAT & POWER | TUOPAI #1 |
Unit size: 75 MWe |
||
2001 | Turkey | ISKENDERUN ENERJI URETIM | ISKENDERUN #2 |
Unit size: 605 MWe |
CASE STUDY | |
2001 | Turkey | ISKENDERUN ENERJI URETIM | ISKENDERUN #1 |
Unit size: 605 MWe |
CASE STUDY | |
2000 | Japan | KOBE STEEL | KOBE #2 |
Unit size: 700 MWe |
||
2000 | Poland | ZESPOL ELEKTRO. BYDGOSZCZ | BYDGOSZCZ #K4 |
Unit size: 65 MWe |
CASE STUDY | |
2000 | Poland | ZESPOL ELEKTRO. BYDGOSZCZ | BYDGOSZCZ #K3 |
Unit size: 65 MWe |
CASE STUDY | |
1999 | Japan | HOKKAIDO ELECTRIC POWER CORP. | TOMATOH-ATSUMA #4 |
Unit size: 700 MWe |
||
1999 | Japan | KOBE STEEL | KOBE #1 |
Unit size: 700 MWe |
||
1998 | Canada | NOVA SCOTIA POWER INC. | TRENTON #5 |
Unit size: 160 MWe |
||
1998 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | CTE Presidente Plutarco Elìas Calles #2 |
Unit size: 350 MWe |
||
1998 | Mexico | COMISION FEDERAL DE ELECTRICIDAD | CTE Presidente Plutarco Elìas Calles #1 |
Unit size: 350 MWe |
||
1998 | Italy | ENEL | LA SPEZIA #3 |
Unit size: 600 MWe |
||
1998 | Italy | ENI | GELA #3 |
Unit size: 150 MWe |
CASE STUDY | |
1998 | Italy | ENI | GELA #2 |
Unit size: 150 MWe |
CASE STUDY | |
1998 | Italy | ENI | GELA #1 |
Unit size: 150 MWe |
CASE STUDY | |
1997 | People's Rep. of China | SANHE ELECTRIC POWER | SANHE #2 |
Unit size: 350 MWe |
||
1997 | People's Rep. of China | SANHE ELECTRIC POWER | SANHE #1 |
Unit size: 350 MWe |
||
1997 | Czech Republic | ENERGETIKA TRINEC | TRINEC #k14 |
Unit size: 60 MWe |
||
1996 | Colombia | STEAG | PAIPA #4 | Unit size: 165 MWe Project type: Greenfield Ash rate: 2.5 t/h Ash rate max: 9 t/h Burned fuel: Coal Boiler manufacturer: B&W | ||
1996 | Chile | EDELNOR | MEJILLONES #2 |
Unit size: 150 MWe Project type: Greenfield Ash rate: 3 t/h Ash rate max: 4 t/h Burned fuel: Coal Boiler manufacturer: B&W / ANSALDO |
CASE STUDY | |
1995 | Italy | ENEL | SULCIS #3 |
Unit size: 240 MWe |
||
1995 | Italy | TIRRENO POWER | VADO LIGURE #4 |
Unit size: 320 MWe |
||
1995 | Italy | TIRRENO POWER | VADO LIGURE #3 |
Unit size: 320 MWe |
||
1995 | Spain | ENDESA | ALMERIA #2 |
Unit size: 550 MWe |
||
1994 | Greece | PUBLIC POWER CORP. | PTOLEMAIS #4 |
Unit size: 300 MWe |
CASE STUDY | |
1994 | Spain | GESA | ALCUDIA #4 |
Unit size: 130 MWe |
||
1994 | Spain | GESA | ALCUDIA #3 |
Unit size: 130 MWe |
||
1994 | Chile | EDELNOR | MEJILLONES #1 |
Unit size: 150 MWe |
CASE STUDY | |
1993 | Italy | ENEL | FUSINA #4 |
Unit size: 320 MWe |
CASE STUDY | |
1993 | USA | FLORIDA POWER CORP. | CRYSTAL RIVER #2 |
Unit size: 500 MWe |
CASE STUDY | |
1993 | Italy | ENEL | FUSINA #3 |
Unit size: 320 MWe |
CASE STUDY | |
1991 | Italy | ENEL | FUSINA #2 |
Unit size: 160 MWe |
CASE STUDY | |
1991 | Italy | ENEL | FUSINA #1 |
Unit size: 160 MWe |
CASE STUDY | |
1991 | Italy | A2A | MONFALCONE #2 |
Unit size: 160 MWe |
||
1990 | Italy | ENEL | BASTARDO #2 |
Unit size: 75 MWe |
||
1990 | Italy | A2A | MONFALCONE #1 |
Unit size: 160 MWe |
||
1989 | Italy | ENEL | BASTARDO #1 |
Unit size: 75 MWe |
||
1985 | Italy | ENEL | PIETRAFITTA #2 |
Unit size: 35 MWe |
||
1985 | Italy | ENEL | PIETRAFITTA #1 |
Unit size: 35 MWe |