Magaldi technologies mechanically handle bottom and fly ashes in a dry way performing at the highest level of reliability and safety, improving overall plant efficiency and reducing the environmental impact of the solid fuel power generation industry.

REFERENCES

Year End User Plant General Data Solution More
2017 Colombia EMGESA S.A. ESP TERMOZIPA #5

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 Colombia EMGESA S.A. ESP TERMOZIPA #4

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 Colombia EMGESA S.A. ESP TERMOZIPA #3

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 Colombia EMGESA S.A. ESP TERMOZIPA #2

Unit size: 37.5 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #4

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #3

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #2

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #1

Unit size: 820 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 Romania COMPLEXUL ENERGETIC OLTENIA ISALNITA 7A

Unit size: 165 MWe
Project type: Retrofit
Ash rate: 6 t/h
Ash rate max: 10 t/h
Burned fuel: Lignite
Boiler manufacturer: MAN

Postcombustion of High UBC Bottom Ash

CASE STUDY
2015 Turkey CENAL ELEKTRİK ÜRETİM A.Ş. KARABIGA #2

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 10 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ALSTOM (China)

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 Turkey CENAL ELEKTRİK ÜRETİM A.Ş. KARABIGA #1

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 10 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ALSTOM (China)

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 Japan CHUBU ELECTRIC+TEPCO HITACHINAKA #3

Unit size: 650 MWe
Project type: Greenfield
Ash rate: 5.9 t/h
Ash rate max: 11.8 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 India HMEL GGSR Captive P.P. #2

Unit size: 100 MWe
Project type: Greenfield
Ash rate max: 8.7 t/h
Burned fuel: Petcoke, Indian coal, imported coal
Boiler manufacturer: ISGEC Heavy Engineering

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2015 India HMEL GGSR Captive P.P. #1

Unit size: 100 MWe
Project type: Greenfield
Ash rate max: 8.7 t/h
Burned fuel: Petcoke, Indian coal, imported coal
Boiler manufacturer: ISGEC Heavy Engineering

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2013 Mongolia Ulaan Baatar Thermal Power Plant #4 UNIT #7

Unit size: 80 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 3.3 t/h
Burned fuel: Brown coal
Boiler manufacturer: BKZ

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 South Korea STX Heavy Industries BUKPYEONG #2

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 18 t/h
Burned fuel: Coal
Boiler manufacturer: BHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 South Korea STX Heavy Industries BUKPYEONG #1

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 18 t/h
Burned fuel: Coal
Boiler manufacturer: BHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 Russia JSC "E.ON Russia" BEREZOVSKAYA GRES #3

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4.7 t/h
Ash rate max: 6 t/h
Burned fuel: Berezovsky brown coal
Boiler manufacturer: PJSC “EMAlliance”

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2012 Mongolia Ulaan Baatar Thermal Power Plant #4 UNIT #8

Unit size: 80 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 3.3 t/h
Burned fuel: Brown coal
Boiler manufacturer: BKZ

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #3

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #2

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 South Korea EWP (Korea East-West Power) DANGJIN #10

Unit size: 1,000 MWe
Project type: Greenfield
Ash rate: 6.8 t/h
Ash rate max: 10.1 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 South Korea EWP (Korea East-West Power) DANGJIN #9

Unit size: 1,000 MWe
Project type: Greenfield
Ash rate: 6.8 t/h
Ash rate max: 10.1 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Germany RWE Power AG GERSTEINWERK #K

Unit size: 770 MWe
Project type: Retrofit
Ash rate: 3.2 t/h
Ash rate max: 6.5 t/h
Peak (sudden ash fall): 50 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: STEINMÜLLER

Postcombustion of High UBC Bottom Ash

CASE STUDY
2010 Czech Republic PLZEŇSKÁ TEPLÁRENSKÁ, a.s. PLZEŇ K4

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 0.9 t/h
Ash rate max: 1.62 t/h
Burned fuel: Brown coal, co-firing of biomass / RDF
Boiler manufacturer: PRVNI BRNENSKA STROJIRNA

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2009 Czech Republic PLZEŇSKÁ TEPLÁRENSKÁ, a.s. PLZEŇ K5

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 0.9 t/h
Ash rate max: 1.62 t/h
Burned fuel: Brown coal, co-firing of biomass / RDF
Boiler manufacturer: PRVNI BRNENSKA STROJIRNA

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2009 Chile SUEZ ENERGY ANDINO S.A. CENTRAL TERMOELECTRICA ANDINA #2

Unit size: 165 MWe
Project type: Greenfield
Ash rate: 5.5 t/h
Ash rate max: 15 t/h
Burned fuel: Petcoke, coal
Boiler manufacturer: FOSTER WHEELER

Fluidized Bed Ash Handling in FBC Power Plants

Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials

CASE STUDY
2009 Chile SUEZ ENERGY ANDINO S.A. CENTRAL TERMOELECTRICA ANDINA #1

Unit size: 165 MWe
Project type: Greenfield
Ash rate: 5.5 t/h
Ash rate max: 15 t/h
Burned fuel: Petcoke, coal
Boiler manufacturer: FOSTER WHEELER

Fluidized Bed Ash Handling in FBC Power Plants

Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials

CASE STUDY
2009 South Korea KOSEP (Korea South-East Power) YEOSU #2

Unit size: 340 MWe
Project type: Greenfield
Ash rate: 8.2 t/h
Ash rate max: 22 t/h
Burned fuel: Anthracite
Boiler manufacturer: DOOSAN HI

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #4

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #3

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Germany RWE Power AG WESTFALEN #E

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, petcoke
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Germany RWE Power AG WESTFALEN #D

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, petcoke
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Germany EVONIK STEAG WALSUM #10

Unit size: 750 MWe
Project type: Greenfield
Ash rate: 5.6 t/h
Ash rate max: 14.1 t/h
Burned fuel: Coal
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Chile ENDESA BOCAMINA #1

Unit size: 128 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Australia MILLMERRAN OPERATING COMPANY MILLMERRAN #2

Unit size: 426 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 40 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Australia MILLMERRAN OPERATING COMPANY MILLMERRAN #1

Unit size: 426 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 40 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 USA BASIN ELECTRIC CORP. DRY FORK #2

Unit size: 385 MWe
Project type: Greenfield
Ash rate: 6 t/h
Ash rate max: 8 t/h
Burned fuel: CPRB (Powder River Basin)
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Mexico COMISION FEDERAL DE ELECTRICIDAD PACIFICO

Unit size: 651 MWe
Project type: Greenfield
Ash rate: 9 t/h
Ash rate max: 22 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2006 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #3

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #4

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #3

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #2

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 India THE WEST BENGAL POWER DEVELOPMENT Co. Ltd. Durgapur #7

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 27 t/h
Ash rate max: 34 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2004 Philippines STEAG State Power Inc. MINDANAO #2

Unit size: 116 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2004 Philippines STEAG State Power Inc. MINDANAO #1

Unit size: 116 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2003 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #4

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2003 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #3

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2003 Italy EP PRODUZIONE FIUME SANTO #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

Dry Bottom Ash Recycling in PCF Power Plants

CASE STUDY
2003 Italy EP PRODUZIONE FIUME SANTO #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

Dry Bottom Ash Recycling in PCF Power Plants

CASE STUDY
2002 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #2

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2002 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #1

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2001 Turkey ISKENDERUN ENERJI URETIM ISKENDERUN #2

Unit size: 605 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: BABCOCK BORSIG POWER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2001 Turkey ISKENDERUN ENERJI URETIM ISKENDERUN #1

Unit size: 605 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: BABCOCK BORSIG POWER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2000 Poland ZESPOL ELEKTRO. BYDGOSZCZ BYDGOSZCZ #K4

Unit size: 65 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: RAFAKO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2000 Poland ZESPOL ELEKTRO. BYDGOSZCZ BYDGOSZCZ #K3

Unit size: 65 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: RAFAKO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1998 Italy ENI GELA #3

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1998 Italy ENI GELA #2

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1998 Italy ENI GELA #1

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1996 Chile EDELNOR MEJILLONES #2

Unit size: 150 MWe Project type: Greenfield Ash rate: 3 t/h Ash rate max: 4 t/h Burned fuel: Coal Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1994 Greece PUBLIC POWER CORP. PTOLEMAIS #4

Unit size: 300 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 25 t/h
Burned fuel: Lignite
Boiler manufacturer: EVT

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1994 Chile EDELNOR MEJILLONES #1

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 4 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 Italy ENEL FUSINA #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate : 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 USA FLORIDA POWER CORP. CRYSTAL RIVER #2

Unit size: 500 MWe
Project type: Retrofit
Ash rate : 4.5 t/h
Ash rate max: 25 t/h
Burned fuel: Coal
Boiler manufacturer: ALSTOM

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 Italy ENEL FUSINA #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate : 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1991 Italy ENEL FUSINA #2

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1991 Italy ENEL FUSINA #1

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2018 Mexico CFE Generaciòn II CARBON II #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate 16.0 - 21.5 t/h
Ash rate max: 33.0 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2018 Mexico CFE Generaciòn II CARBON II #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate 16.0 - 21.5 t/h
Ash rate max: 33.0 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2017 South Korea Goseong Green Power Co., Ltd. GOSEONG #2

Unit size: 1040 MWe
Project type: Greenfield
Ash rate 7.63 t/h
Ash rate max: 22.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DHI

Dry Bottom Ash Handling in PCF Power Plants

2017 South Korea Goseong Green Power Co., Ltd. GOSEONG #1

Unit size: 1040 MWe
Project type: Greenfield
Ash rate 7.63 t/h
Ash rate max: 22.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DHI

Dry Bottom Ash Handling in PCF Power Plants

2017 South Korea KOMIPO (Korea Midland Power) SHINSEOCHEON #1

Unit size: 1020 MWe
Project type: Greenfield
Ash rate 8.1 t/h
Ash rate max: 35 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

2017 Japan J-POWER Co. Ltd. TAKEHARA #1

Unit size: 600 MWe
Project type: Greenfield
Ash rate 8.9 t/h
Ash rate max: 20.9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2016 Japan KOBE STEEL Ltd. SHINKO KOBE #4

Unit size: 650 MWe
Project type: Greenfield
Ash rate 3.18 t/h
Ash rate max: 4.77 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2016 Japan KOBE STEEL Ltd. SHINKO KOBE #3

Unit size: 650 MWe
Project type: Greenfield
Ash rate 3.18 t/h
Ash rate max: 4.77 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2016 Japan Tohoku Electric Power Co. Inc. NOSHIRO #3

Unit size: 600 MWe
Project type: Greenfield
Ash rate 4.5 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #3

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #2

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #1

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Japan KASHIMA POWER KASHIMA #2

Unit size: 645 MWe
Project type: Greenfield
Ash rate: 4.7 t/h
Ash rate max: 9.4 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2015 Chile E-CL (GDF SUEZ) RED DRAGON #7

Unit size: 375 MWe
Project type: Greenfield
Ash rate: 5.95 t/h
Ash rate max: 15.5 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2015 Slovakia U. S. Steel Košice, s.r.o. K7

Unit size: 226 MWth
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 4.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ENERGYCO s.r.o.

Dry Bottom Ash Handling in PCF Power Plants

2015 Slovakia U. S. Steel Košice, s.r.o. K6

Unit size: 226 MWth
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 4.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ENERGYCO s.r.o.

Dry Bottom Ash Handling in PCF Power Plants

2014 South Korea KOWEPO (Korea Western Power) TAEAN #10

Unit size: 1050 MWe
Project type: Greenfield
Ash rate: 8.8 t/h
Ash rate max: 26.4 t/h
Burned fuel: Sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2014 South Korea KOWEPO (Korea Western Power) TAEAN #9

Unit size: 1050 MWe
Project type: Greenfield
Ash rate: 8.8 t/h
Ash rate max: 26.4 t/h
Burned fuel: Sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOMIPO (Korea Midland Power) SHINBORYONG #2

Unit size: 1000 MWe
Project type: Greenfield
Ash rate: 10.4 t/h
Ash rate max: 34.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOMIPO (Korea Midland Power) SHINBORYONG #1

Unit size: 1000 MWe
Project type: Greenfield
Ash rate: 10.4 t/h
Ash rate max: 34.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOSEP (Korea South-East Power) YEOSU #1

Unit size: 340 MWe
Project type: Greenfield
Ash rate: 18 t/h
Ash rate max: 36 t/h
Burned fuel: Anthracite
Boiler manufacturer: DOOSAN HI

Fluidized Bed Ash Handling in FBC Power Plants

2013 India OPG POWER GUMMIDIPOONDI #4

Unit size:160 MWe
Project type: Greenfield
Ash rate: 10.8 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: ISGEC Heavy Engineering

Dry Bottom Ash Handling in PCF Power Plants

2013 India OPG POWER GUJARAT #2

Unit size:150 MWe
Project type: Greenfield
Ash rate: 10 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2013 India OPG POWER GUJARAT #1

Unit size:150 MWe
Project type: Greenfield
Ash rate: 10 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2012 India SKS RAIGARH #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 22.2 t/h
Ash rate max: 32 t/h
Burned fuel: Indian coal
Boiler manufacturer: CETHAR

Dry Bottom Ash Handling in PCF Power Plants

2012 India SKS RAIGARH #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 22.2 t/h
Ash rate max: 32 t/h
Burned fuel: Indian coal
Boiler manufacturer: CETHAR

Dry Bottom Ash Handling in PCF Power Plants

2012 South Korea KOSEP (Korea South-East Power) YONGHUNG #6

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 3.7 t/h
Ash rate max: 8.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2012 South Korea KOSEP (Korea South-East Power) YONGHUNG #5

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 3.7 t/h
Ash rate max: 8.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2012 India THE WEST BENGAL POWER DEVELOPMENT Co. Durgapur #8

Unit size: 250 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 30 t/h
Burned fuel: Coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants burning high-ash content coals

2011 India HINDALCO ADITYA ALUMINIUM #6

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #5

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #4

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #3

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #2

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #1

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India OPG POWER GUMMIDIPOONDI #3

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2010 India SARDA Metals & Alloys VISHAKPATNAM ANDRA PRADESH #1

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #4

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #3

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #2

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India GMR Energy WARORA, MAHARASHTRA #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 25 t/h
Ash rate max: 50 t/h
Burned fuel: Coal
Boiler manufacturer: SHANGHAI BOILER WORKS

Dry Bottom Ash Handling in PCF Power Plants

2010 India GMR Energy WARORA, MAHARASHTRA #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 25 t/h
Ash rate max: 50 t/h
Burned fuel: Coal
Boiler manufacturer: SHANGHAI BOILER WORKS

Dry Bottom Ash Handling in PCF Power Plants

2009 The Netherlands ELECTRABEL GDF Suez ROTTERDAM

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

2009 The Netherlands RWE Power AG EEMSHAVEN #2

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

2009 The Netherlands RWE Power AG EEMSHAVEN #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

2008 Chile COLBUN S.A. CORONEL #1

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

2008 Germany ELECTRABEL GDF Suez WILHELMSHAVEN #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #4

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #3

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #2

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #1

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #4

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #3

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #2

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #1

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 India OPG POWER GUMMIDIPOONDI #2

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2008 India OPG POWER GUMMIDIPOONDI #1

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX ITAQUI #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #3

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #2

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Chile ENDESA BOCAMINA #2

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

2007 Spain GESA ALCUDIA #2

Unit size: 125 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Spain GESA ALCUDIA #1

Unit size: 125 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Portugal EDP SINES #3

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2007 Australia THE GRIFFIN GROUP BLUEWATERS #2

Unit size: 208 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Mexico CERREY S.A. DE C.V. ZACATECAS #5

Unit size: 129 MWe
Project type: Retrofit
Ash rate: 0.6 t/h
Ash rate max: 1 t/h
Burned fuel: Bagasse
Boiler manufacturer: CERREY

Dry Bottom Ash Handling in PCF Power Plants

2007 Australia THE GRIFFIN GROUP BLUEWATERS #1

Unit size: 208 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2006 Spain ENDESA ALMERIA #1

Unit size: 577 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: ABB / C.E.

Dry Bottom Ash Handling in PCF Power Plants

2006 Japan THE KANSAI ELECTRIC POWER Co. MAIZURU #2

Unit size: 900 MWe
Project type: Greenfield
Ash rate: 6 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2006 Portugal EDP SINES #1

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2006 France SNET / E.ON EMILE HUCHET

Unit size: 125 MWe
Project type: Greenfield
Ash rate: 15 t/h
Ash rate max: 22 t/h
Burned fuel: Coal
Boiler manufacturer: ALSTOM

Fluidized Bed Ash Handling in FBC Power Plants

2006 South Korea KOSEP (Korea South-East Power) YONGHUNG #4

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 6.1 t/h
Ash rate max: 12.2 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2006 South Korea KOSEP (Korea South-East Power) YONGHUNG #3

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 6.1 t/h
Ash rate max: 12.2 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2005 South Korea KOSPO (Korea Southern Power) HADONG #8

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2005 South Korea KOSPO (Korea Southern Power) HADONG #7

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2005 Japan J-POWER ISOGO #2

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 13 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2005 Spain HC Energia / EDP ABOÑO #2

Unit size: 556 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2005 Portugal EDP SINES #2

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2004 South Korea KOWEPO (Korea Western Power) TAEAN #8

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2004 South Korea KOWEPO (Korea Western Power) TAEAN #7

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2004 Japan SUMITOMO METAL INDUSTRIES KASHIMA STEELWORKS

Unit size: 507 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2004 Portugal EDP SINES #4

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2004 Australia CS ENERGY CALLIDE B #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 9 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2004 Australia CS ENERGY CALLIDE B #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 9 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China SP POWER DEVELOPMENT Co. DATONG #6

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2003 Japan NIPPON BEET SUGAR MFG Co. MEMURO

Unit size: 15 MWe
Project type: Greenfield
Ash rate: 0.3 t/h
Ash rate max: 1 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

2003 Australia DELTA ELECTRICITY WALLERAWANG #8

Unit size: 500 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2003 Australia DELTA ELECTRICITY WALLERAWANG #7

Unit size: 500 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China CHANGCHUN SECOND HEAT & POWER Co. CHANGCHUN #2

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China CHANGCHUN SECOND HEAT & POWER Co. CHANGCHUN #1

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2002 Italy ENEL GENOVA #9

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2002 Spain E.ON SPAIN LOS BARRIOS #1

Unit size: 550 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / H8

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #8

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #7

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #6

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #5

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 People's Rep. of China SICHUAN TUOPAI HEAT & POWER TUOPAI #2

Unit size: 75 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: JINAN BOILER PLANT

Fluidized Bed Ash Handling in FBC Power Plants

2001 People's Rep. of China SICHUAN TUOPAI HEAT & POWER TUOPAI #1

Unit size: 75 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: JINAN BOILER PLANT

Fluidized Bed Ash Handling in FBC Power Plants

2000 Japan KOBE STEEL KOBE #2

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

1999 Japan HOKKAIDO ELECTRIC POWER CORP. TOMATOH-ATSUMA #4

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1999 Japan KOBE STEEL KOBE #1

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Canada NOVA SCOTIA POWER INC. TRENTON #5

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1.8 t/h
Ash rate max: 11 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1998 Mexico COMISION FEDERAL DE ELECTRICIDAD CTE Presidente Plutarco Elìas Calles #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Mexico COMISION FEDERAL DE ELECTRICIDAD CTE Presidente Plutarco Elìas Calles #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Italy ENEL LA SPEZIA #3

Unit size: 600 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1997 People's Rep. of China SANHE ELECTRIC POWER SANHE #2

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 4.5 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1997 People's Rep. of China SANHE ELECTRIC POWER SANHE #1

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 4.5 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1997 Czech Republic ENERGETIKA TRINEC TRINEC #k14

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 4 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

1996 Colombia STEAG PAIPA #4 Unit size: 165 MWe Project type: Greenfield Ash rate: 2.5 t/h Ash rate max: 9 t/h Burned fuel: Coal Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1995 Italy ENEL SULCIS #3

Unit size: 240 MWe
Project type: Retrofit
Ash rate: 6 t/h
Ash rate max: 15 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Italy TIRRENO POWER VADO LIGURE #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Italy TIRRENO POWER VADO LIGURE #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Spain ENDESA ALMERIA #2

Unit size: 550 MWe
Project type: Greenfield
Ash rate: 6.5 t/h
Ash rate max: 25 t/h
Burned fuel: Coal
Boiler manufacturer: ABB / C.E.

Dry Bottom Ash Handling in PCF Power Plants

1994 Spain GESA ALCUDIA #4

Unit size: 130 MWe
Project type: Greenfield
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1994 Spain GESA ALCUDIA #3

Unit size: 130 MWe
Project type: Greenfield
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1991 Italy A2A MONFALCONE #2

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

1990 Italy ENEL BASTARDO #2

Unit size: 75 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 2 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1990 Italy A2A MONFALCONE #1

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

1989 Italy ENEL BASTARDO #1

Unit size: 75 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 2 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1985 Italy ENEL PIETRAFITTA #2

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 10 t/h
Burned fuel : Lignite
Boiler manufacturer: DURR-WERKE

Dry Bottom Ash Handling in PCF Power Plants

1985 Italy ENEL PIETRAFITTA #1

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 10 t/h
Burned fuel : Lignite
Boiler manufacturer: DURR-WERKE

Dry Bottom Ash Handling in PCF Power Plants

REFERENCES

Year Country End User Plant General Data Solution More
2018 Mexico CFE Generaciòn II CARBON II #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate 16.0 - 21.5 t/h
Ash rate max: 33.0 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2018 Mexico CFE Generaciòn II CARBON II #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate 16.0 - 21.5 t/h
Ash rate max: 33.0 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2017 Colombia EMGESA S.A. ESP TERMOZIPA #5

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 South Korea Goseong Green Power Co., Ltd. GOSEONG #2

Unit size: 1040 MWe
Project type: Greenfield
Ash rate 7.63 t/h
Ash rate max: 22.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DHI

Dry Bottom Ash Handling in PCF Power Plants

2017 South Korea Goseong Green Power Co., Ltd. GOSEONG #1

Unit size: 1040 MWe
Project type: Greenfield
Ash rate 7.63 t/h
Ash rate max: 22.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DHI

Dry Bottom Ash Handling in PCF Power Plants

2017 South Korea KOMIPO (Korea Midland Power) SHINSEOCHEON #1

Unit size: 1020 MWe
Project type: Greenfield
Ash rate 8.1 t/h
Ash rate max: 35 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

2017 Japan J-POWER Co. Ltd. TAKEHARA #1

Unit size: 600 MWe
Project type: Greenfield
Ash rate 8.9 t/h
Ash rate max: 20.9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2017 Colombia EMGESA S.A. ESP TERMOZIPA #4

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 Colombia EMGESA S.A. ESP TERMOZIPA #3

Unit size: 66 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2017 Colombia EMGESA S.A. ESP TERMOZIPA #2

Unit size: 37.5 MWe
Project type: Retrofit
Ash rate 1 t/h
Ash rate max: 1.6 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #4

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #3

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #2

Unit size: 915 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 USA GEORGIA POWER - SOUTHERN COMPANY SCHERER #1

Unit size: 820 MWe
Project type: Retrofit
Ash rate 5.2 t/h
Ash rate max: 13.6 t/h
Burned fuel: PRB (Powder River Basin)
Boiler manufacturer: COMBUSTION ENGINEERING

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2016 Romania COMPLEXUL ENERGETIC OLTENIA ISALNITA 7A

Unit size: 165 MWe
Project type: Retrofit
Ash rate: 6 t/h
Ash rate max: 10 t/h
Burned fuel: Lignite
Boiler manufacturer: MAN

Postcombustion of High UBC Bottom Ash

CASE STUDY
2016 Japan KOBE STEEL Ltd. SHINKO KOBE #4

Unit size: 650 MWe
Project type: Greenfield
Ash rate 3.18 t/h
Ash rate max: 4.77 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2016 Japan KOBE STEEL Ltd. SHINKO KOBE #3

Unit size: 650 MWe
Project type: Greenfield
Ash rate 3.18 t/h
Ash rate max: 4.77 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2016 Japan Tohoku Electric Power Co. Inc. NOSHIRO #3

Unit size: 600 MWe
Project type: Greenfield
Ash rate 4.5 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #3

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #2

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Turkey ENERJI SA TUFANBEYLI #1

Unit size: 150 MWe
Project type: Retrofit
Ash rate max: 72 t/h
Burned fuel: Lignite
Boiler manufacturer: HYUNDAI HI

Fluidized Bed Ash Handling in FBC Power Plants

2015 Japan KASHIMA POWER KASHIMA #2

Unit size: 645 MWe
Project type: Greenfield
Ash rate: 4.7 t/h
Ash rate max: 9.4 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2015 Chile E-CL (GDF SUEZ) RED DRAGON #7

Unit size: 375 MWe
Project type: Greenfield
Ash rate: 5.95 t/h
Ash rate max: 15.5 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2015 Turkey CENAL ELEKTRİK ÜRETİM A.Ş. KARABIGA #2

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 10 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ALSTOM (China)

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 Turkey CENAL ELEKTRİK ÜRETİM A.Ş. KARABIGA #1

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 10 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ALSTOM (China)

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 Slovakia U. S. Steel Košice, s.r.o. K7

Unit size: 226 MWth
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 4.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ENERGYCO s.r.o.

Dry Bottom Ash Handling in PCF Power Plants

2015 Slovakia U. S. Steel Košice, s.r.o. K6

Unit size: 226 MWth
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 4.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: ENERGYCO s.r.o.

Dry Bottom Ash Handling in PCF Power Plants

2015 Japan CHUBU ELECTRIC+TEPCO HITACHINAKA #3

Unit size: 650 MWe
Project type: Greenfield
Ash rate: 5.9 t/h
Ash rate max: 11.8 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHPS

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2015 India HMEL GGSR Captive P.P. #2

Unit size: 100 MWe
Project type: Greenfield
Ash rate max: 8.7 t/h
Burned fuel: Petcoke, Indian coal, imported coal
Boiler manufacturer: ISGEC Heavy Engineering

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2015 India HMEL GGSR Captive P.P. #1

Unit size: 100 MWe
Project type: Greenfield
Ash rate max: 8.7 t/h
Burned fuel: Petcoke, Indian coal, imported coal
Boiler manufacturer: ISGEC Heavy Engineering

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2014 South Korea KOWEPO (Korea Western Power) TAEAN #10

Unit size: 1050 MWe
Project type: Greenfield
Ash rate: 8.8 t/h
Ash rate max: 26.4 t/h
Burned fuel: Sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2014 South Korea KOWEPO (Korea Western Power) TAEAN #9

Unit size: 1050 MWe
Project type: Greenfield
Ash rate: 8.8 t/h
Ash rate max: 26.4 t/h
Burned fuel: Sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOMIPO (Korea Midland Power) SHINBORYONG #2

Unit size: 1000 MWe
Project type: Greenfield
Ash rate: 10.4 t/h
Ash rate max: 34.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOMIPO (Korea Midland Power) SHINBORYONG #1

Unit size: 1000 MWe
Project type: Greenfield
Ash rate: 10.4 t/h
Ash rate max: 34.9 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2013 South Korea KOSEP (Korea South-East Power) YEOSU #1

Unit size: 340 MWe
Project type: Greenfield
Ash rate: 18 t/h
Ash rate max: 36 t/h
Burned fuel: Anthracite
Boiler manufacturer: DOOSAN HI

Fluidized Bed Ash Handling in FBC Power Plants

2013 Mongolia Ulaan Baatar Thermal Power Plant #4 UNIT #7

Unit size: 80 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 3.3 t/h
Burned fuel: Brown coal
Boiler manufacturer: BKZ

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 South Korea STX Heavy Industries BUKPYEONG #2

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 18 t/h
Burned fuel: Coal
Boiler manufacturer: BHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 South Korea STX Heavy Industries BUKPYEONG #1

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 18 t/h
Burned fuel: Coal
Boiler manufacturer: BHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2013 India OPG POWER GUMMIDIPOONDI #4

Unit size:160 MWe
Project type: Greenfield
Ash rate: 10.8 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: ISGEC Heavy Engineering

Dry Bottom Ash Handling in PCF Power Plants

2013 India OPG POWER GUJARAT #2

Unit size:150 MWe
Project type: Greenfield
Ash rate: 10 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2013 India OPG POWER GUJARAT #1

Unit size:150 MWe
Project type: Greenfield
Ash rate: 10 t/h
Ash rate max: 20 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2013 Russia JSC "E.ON Russia" BEREZOVSKAYA GRES #3

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4.7 t/h
Ash rate max: 6 t/h
Burned fuel: Berezovsky brown coal
Boiler manufacturer: PJSC “EMAlliance”

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2012 India SKS RAIGARH #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 22.2 t/h
Ash rate max: 32 t/h
Burned fuel: Indian coal
Boiler manufacturer: CETHAR

Dry Bottom Ash Handling in PCF Power Plants

2012 India SKS RAIGARH #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 22.2 t/h
Ash rate max: 32 t/h
Burned fuel: Indian coal
Boiler manufacturer: CETHAR

Dry Bottom Ash Handling in PCF Power Plants

2012 South Korea KOSEP (Korea South-East Power) YONGHUNG #6

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 3.7 t/h
Ash rate max: 8.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2012 South Korea KOSEP (Korea South-East Power) YONGHUNG #5

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 3.7 t/h
Ash rate max: 8.5 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2012 India THE WEST BENGAL POWER DEVELOPMENT Co. Durgapur #8

Unit size: 250 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 30 t/h
Burned fuel: Coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants burning high-ash content coals

2012 Mongolia Ulaan Baatar Thermal Power Plant #4 UNIT #8

Unit size: 80 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 3.3 t/h
Burned fuel: Brown coal
Boiler manufacturer: BKZ

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #3

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #2

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 Taiwan Taiwan Power Company (TPC) LINKOU #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 7.5 t/h
Ash rate max: 15.1 t/h
Burned fuel: Bituminous coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 South Korea EWP (Korea East-West Power) DANGJIN #10

Unit size: 1,000 MWe
Project type: Greenfield
Ash rate: 6.8 t/h
Ash rate max: 10.1 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 South Korea EWP (Korea East-West Power) DANGJIN #9

Unit size: 1,000 MWe
Project type: Greenfield
Ash rate: 6.8 t/h
Ash rate max: 10.1 t/h
Burned fuel: Bituminous / sub-bituminous coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2011 India HINDALCO ADITYA ALUMINIUM #6

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #5

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #4

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #3

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #2

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 India HINDALCO ADITYA ALUMINIUM #1

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 12 t/h
Ash rate max: 31 t/h
Burned fuel: Indian coal
Boiler manufacturer: BHEL

Dry Bottom Ash Handling in PCF Power Plants

2011 Germany RWE Power AG GERSTEINWERK #K

Unit size: 770 MWe
Project type: Retrofit
Ash rate: 3.2 t/h
Ash rate max: 6.5 t/h
Peak (sudden ash fall): 50 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: STEINMÜLLER

Postcombustion of High UBC Bottom Ash

CASE STUDY
2011 India OPG POWER GUMMIDIPOONDI #3

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2010 Czech Republic PLZEŇSKÁ TEPLÁRENSKÁ, a.s. PLZEŇ K4

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 0.9 t/h
Ash rate max: 1.62 t/h
Burned fuel: Brown coal, co-firing of biomass / RDF
Boiler manufacturer: PRVNI BRNENSKA STROJIRNA

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2010 India SARDA Metals & Alloys VISHAKPATNAM ANDRA PRADESH #1

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #4

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #3

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #2

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India R.K.M. PowerGen UCCHPINDA, CHHATTISGARH #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 20 t/h
Ash rate max: 36 t/h
Burned fuel: Coal
Boiler manufacturer: WESTERN POWER

Dry Bottom Ash Handling in PCF Power Plants

2010 India GMR Energy WARORA, MAHARASHTRA #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 25 t/h
Ash rate max: 50 t/h
Burned fuel: Coal
Boiler manufacturer: SHANGHAI BOILER WORKS

Dry Bottom Ash Handling in PCF Power Plants

2010 India GMR Energy WARORA, MAHARASHTRA #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 25 t/h
Ash rate max: 50 t/h
Burned fuel: Coal
Boiler manufacturer: SHANGHAI BOILER WORKS

Dry Bottom Ash Handling in PCF Power Plants

2009 Czech Republic PLZEŇSKÁ TEPLÁRENSKÁ, a.s. PLZEŇ K5

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 0.9 t/h
Ash rate max: 1.62 t/h
Burned fuel: Brown coal, co-firing of biomass / RDF
Boiler manufacturer: PRVNI BRNENSKA STROJIRNA

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2009 Chile SUEZ ENERGY ANDINO S.A. CENTRAL TERMOELECTRICA ANDINA #2

Unit size: 165 MWe
Project type: Greenfield
Ash rate: 5.5 t/h
Ash rate max: 15 t/h
Burned fuel: Petcoke, coal
Boiler manufacturer: FOSTER WHEELER

Fluidized Bed Ash Handling in FBC Power Plants

Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials

CASE STUDY
2009 Chile SUEZ ENERGY ANDINO S.A. CENTRAL TERMOELECTRICA ANDINA #1

Unit size: 165 MWe
Project type: Greenfield
Ash rate: 5.5 t/h
Ash rate max: 15 t/h
Burned fuel: Petcoke, coal
Boiler manufacturer: FOSTER WHEELER

Fluidized Bed Ash Handling in FBC Power Plants

Mechanical Dust Proof Steel Belt Conveyor for Handling of Bulk Materials

CASE STUDY
2009 The Netherlands ELECTRABEL GDF Suez ROTTERDAM

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

2009 The Netherlands RWE Power AG EEMSHAVEN #2

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

2009 The Netherlands RWE Power AG EEMSHAVEN #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

2009 South Korea KOSEP (Korea South-East Power) YEOSU #2

Unit size: 340 MWe
Project type: Greenfield
Ash rate: 8.2 t/h
Ash rate max: 22 t/h
Burned fuel: Anthracite
Boiler manufacturer: DOOSAN HI

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2008 Chile COLBUN S.A. CORONEL #1

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

2008 Germany ELECTRABEL GDF Suez WILHELMSHAVEN #1

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #4

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #3

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #2

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia ERARING ENERGY ERARING #1

Unit size: 660 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #4

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #3

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #2

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 Australia MACQUARIE GENERATION LIDDELL #1

Unit size: 430 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 17 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2008 India OPG POWER GUMMIDIPOONDI #2

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2008 India OPG POWER GUMMIDIPOONDI #1

Unit size: 80 MWe
Project type: Greenfield
Ash rate: 1.5 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX ITAQUI #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #3

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #2

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 Brazil EDB-MPX PECEM #1

Unit size: 360 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN BABCOCK

Dry Bottom Ash Handling in PCF Power Plants

2008 India JSW Energy RATNAGIRI #4

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #3

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #2

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 India JSW Energy RATNAGIRI #1

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: SEC

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Chile ENDESA BOCAMINA #2

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

2008 Germany RWE Power AG WESTFALEN #E

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, petcoke
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Germany RWE Power AG WESTFALEN #D

Unit size: 800 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 21.9 t/h
Burned fuel: Coal, petcoke
Boiler manufacturer: ALSTOM Power Systems

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Germany EVONIK STEAG WALSUM #10

Unit size: 750 MWe
Project type: Greenfield
Ash rate: 5.6 t/h
Ash rate max: 14.1 t/h
Burned fuel: Coal
Boiler manufacturer: HITACHI Power Europe

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2008 Chile ENDESA BOCAMINA #1

Unit size: 128 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Spain GESA ALCUDIA #2

Unit size: 125 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Spain GESA ALCUDIA #1

Unit size: 125 MWe
Project type: Retrofit
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Australia MILLMERRAN OPERATING COMPANY MILLMERRAN #2

Unit size: 426 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 40 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Australia MILLMERRAN OPERATING COMPANY MILLMERRAN #1

Unit size: 426 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 40 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 USA BASIN ELECTRIC CORP. DRY FORK #2

Unit size: 385 MWe
Project type: Greenfield
Ash rate: 6 t/h
Ash rate max: 8 t/h
Burned fuel: CPRB (Powder River Basin)
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2007 Portugal EDP SINES #3

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2007 Australia THE GRIFFIN GROUP BLUEWATERS #2

Unit size: 208 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Mexico CERREY S.A. DE C.V. ZACATECAS #5

Unit size: 129 MWe
Project type: Retrofit
Ash rate: 0.6 t/h
Ash rate max: 1 t/h
Burned fuel: Bagasse
Boiler manufacturer: CERREY

Dry Bottom Ash Handling in PCF Power Plants

2007 Australia THE GRIFFIN GROUP BLUEWATERS #1

Unit size: 208 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2007 Mexico COMISION FEDERAL DE ELECTRICIDAD PACIFICO

Unit size: 651 MWe
Project type: Greenfield
Ash rate: 9 t/h
Ash rate max: 22 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2006 Spain ENDESA ALMERIA #1

Unit size: 577 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: ABB / C.E.

Dry Bottom Ash Handling in PCF Power Plants

2006 Japan THE KANSAI ELECTRIC POWER Co. MAIZURU #2

Unit size: 900 MWe
Project type: Greenfield
Ash rate: 6 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2006 Portugal EDP SINES #1

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2006 France SNET / E.ON EMILE HUCHET

Unit size: 125 MWe
Project type: Greenfield
Ash rate: 15 t/h
Ash rate max: 22 t/h
Burned fuel: Coal
Boiler manufacturer: ALSTOM

Fluidized Bed Ash Handling in FBC Power Plants

2006 South Korea KOSEP (Korea South-East Power) YONGHUNG #4

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 6.1 t/h
Ash rate max: 12.2 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2006 South Korea KOSEP (Korea South-East Power) YONGHUNG #3

Unit size: 870 MWe
Project type: Greenfield
Ash rate: 6.1 t/h
Ash rate max: 12.2 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2006 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 South Korea KOSPO (Korea Southern Power) HADONG #8

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2005 South Korea KOSPO (Korea Southern Power) HADONG #7

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2005 Japan J-POWER ISOGO #2

Unit size: 600 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 13 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2005 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #3

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #4

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #3

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 Italy ENEL TORREVALDALIGA NORD #2

Unit size: 660 MWe
Project type: Greenfield
Ash rate: 7 t/h
Ash rate max: 20 t/h
Burned fuel: Coal
Boiler manufacturer: ANSALDO / BHK

Dry Bottom Ash Handling in PCF Power Plants

Dry Mill Rejects Handling in PCF Power Plants

CASE STUDY
2005 Spain HC Energia / EDP ABOÑO #2

Unit size: 556 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2005 People's Rep. of China BAOSTEEL - Baoshan Iron & Steel Co. BAOSHAN #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2005 Portugal EDP SINES #2

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2005 India THE WEST BENGAL POWER DEVELOPMENT Co. Ltd. Durgapur #7

Unit size: 300 MWe
Project type: Greenfield
Ash rate: 27 t/h
Ash rate max: 34 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2004 South Korea KOWEPO (Korea Western Power) TAEAN #8

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2004 South Korea KOWEPO (Korea Western Power) TAEAN #7

Unit size: 500 MWe
Project type: Greenfield
Ash rate: 4 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DOOSAN HI

Dry Bottom Ash Handling in PCF Power Plants

2004 Philippines STEAG State Power Inc. MINDANAO #2

Unit size: 116 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2004 Philippines STEAG State Power Inc. MINDANAO #1

Unit size: 116 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2004 Japan SUMITOMO METAL INDUSTRIES KASHIMA STEELWORKS

Unit size: 507 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2004 Portugal EDP SINES #4

Unit size: 314 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: FOSTER WHEELER

Dry Bottom Ash Handling in PCF Power Plants

2004 Australia CS ENERGY CALLIDE B #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 9 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2004 Australia CS ENERGY CALLIDE B #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 9 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: BHK

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #4

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2003 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #3

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2003 People's Rep. of China SP POWER DEVELOPMENT Co. DATONG #6

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2003 Japan NIPPON BEET SUGAR MFG Co. MEMURO

Unit size: 15 MWe
Project type: Greenfield
Ash rate: 0.3 t/h
Ash rate max: 1 t/h
Burned fuel: Coal
Boiler manufacturer: KHI

Dry Bottom Ash Handling in PCF Power Plants

2003 Australia DELTA ELECTRICITY WALLERAWANG #8

Unit size: 500 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2003 Australia DELTA ELECTRICITY WALLERAWANG #7

Unit size: 500 MWe
Project type: Retrofit
Ash rate: 8 t/h
Ash rate max: 12 t/h
Burned fuel: Coal
Boiler manufacturer: C.E.

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China CHANGCHUN SECOND HEAT & POWER Co. CHANGCHUN #2

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2003 People's Rep. of China CHANGCHUN SECOND HEAT & POWER Co. CHANGCHUN #1

Unit size: 200 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: DONGFANG BOILER

Dry Bottom Ash Handling in PCF Power Plants

2003 Italy EP PRODUZIONE FIUME SANTO #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

Dry Bottom Ash Recycling in PCF Power Plants

CASE STUDY
2003 Italy EP PRODUZIONE FIUME SANTO #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

Dry Bottom Ash Recycling in PCF Power Plants

CASE STUDY
2002 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #2

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2002 People's Rep. of China JIANGSU PROVINCIAL ELECTRIC POWER Co. JIAWANG #1

Unit size: 135 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 6 t/h
Burned fuel: Coal
Boiler manufacturer: HARBIN BOILER

Fluidized Bed Ash Handling in FBC Power Plants

CASE STUDY
2002 Italy ENEL GENOVA #9

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2002 Spain E.ON SPAIN LOS BARRIOS #1

Unit size: 550 MWe
Project type: Retrofit
Ash rate: 5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / H8

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #8

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #7

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #6

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 Italy ENEL GENOVA #5

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

2001 People's Rep. of China SICHUAN TUOPAI HEAT & POWER TUOPAI #2

Unit size: 75 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: JINAN BOILER PLANT

Fluidized Bed Ash Handling in FBC Power Plants

2001 People's Rep. of China SICHUAN TUOPAI HEAT & POWER TUOPAI #1

Unit size: 75 MWe
Project type: Greenfield
Ash rate: 1 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: JINAN BOILER PLANT

Fluidized Bed Ash Handling in FBC Power Plants

2001 Turkey ISKENDERUN ENERJI URETIM ISKENDERUN #2

Unit size: 605 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: BABCOCK BORSIG POWER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2001 Turkey ISKENDERUN ENERJI URETIM ISKENDERUN #1

Unit size: 605 MWe
Project type: Greenfield
Ash rate: 5 t/h
Ash rate max: 15 t/h
Burned fuel: Coal
Boiler manufacturer: BABCOCK BORSIG POWER

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2000 Japan KOBE STEEL KOBE #2

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: IHI

Dry Bottom Ash Handling in PCF Power Plants

2000 Poland ZESPOL ELEKTRO. BYDGOSZCZ BYDGOSZCZ #K4

Unit size: 65 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: RAFAKO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
2000 Poland ZESPOL ELEKTRO. BYDGOSZCZ BYDGOSZCZ #K3

Unit size: 65 MWe
Project type: Retrofit
Ash rate: 3 t/h
Ash rate max: 9 t/h
Burned fuel: Coal
Boiler manufacturer: RAFAKO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1999 Japan HOKKAIDO ELECTRIC POWER CORP. TOMATOH-ATSUMA #4

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1999 Japan KOBE STEEL KOBE #1

Unit size: 700 MWe
Project type: Greenfield
Ash rate: 3.4 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Canada NOVA SCOTIA POWER INC. TRENTON #5

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1.8 t/h
Ash rate max: 11 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1998 Mexico COMISION FEDERAL DE ELECTRICIDAD CTE Presidente Plutarco Elìas Calles #2

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Mexico COMISION FEDERAL DE ELECTRICIDAD CTE Presidente Plutarco Elìas Calles #1

Unit size: 350 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 5 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1998 Italy ENEL LA SPEZIA #3

Unit size: 600 MWe
Project type: Retrofit
Ash rate: 7 t/h
Ash rate max: 14 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1998 Italy ENI GELA #3

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1998 Italy ENI GELA #2

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1998 Italy ENI GELA #1

Unit size: 150 MWe
Project type: Retrofit
Ash rate: 1 t/h
Ash rate max: 2 t/h
Burned fuel: Petcoke
Boiler manufacturer: ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1997 People's Rep. of China SANHE ELECTRIC POWER SANHE #2

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 4.5 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1997 People's Rep. of China SANHE ELECTRIC POWER SANHE #1

Unit size: 350 MWe
Project type: Greenfield
Ash rate: 4.5 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1997 Czech Republic ENERGETIKA TRINEC TRINEC #k14

Unit size: 60 MWe
Project type: Retrofit
Ash rate: 4 t/h
Ash rate max: 16 t/h
Burned fuel: Coal
Boiler manufacturer: S.E.S.

Dry Bottom Ash Handling in PCF Power Plants

1996 Colombia STEAG PAIPA #4 Unit size: 165 MWe Project type: Greenfield Ash rate: 2.5 t/h Ash rate max: 9 t/h Burned fuel: Coal Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

1996 Chile EDELNOR MEJILLONES #2

Unit size: 150 MWe Project type: Greenfield Ash rate: 3 t/h Ash rate max: 4 t/h Burned fuel: Coal Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1995 Italy ENEL SULCIS #3

Unit size: 240 MWe
Project type: Retrofit
Ash rate: 6 t/h
Ash rate max: 15 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Italy TIRRENO POWER VADO LIGURE #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Italy TIRRENO POWER VADO LIGURE #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1995 Spain ENDESA ALMERIA #2

Unit size: 550 MWe
Project type: Greenfield
Ash rate: 6.5 t/h
Ash rate max: 25 t/h
Burned fuel: Coal
Boiler manufacturer: ABB / C.E.

Dry Bottom Ash Handling in PCF Power Plants

1994 Greece PUBLIC POWER CORP. PTOLEMAIS #4

Unit size: 300 MWe
Project type: Retrofit
Ash rate: 12 t/h
Ash rate max: 25 t/h
Burned fuel: Lignite
Boiler manufacturer: EVT

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1994 Spain GESA ALCUDIA #4

Unit size: 130 MWe
Project type: Greenfield
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1994 Spain GESA ALCUDIA #3

Unit size: 130 MWe
Project type: Greenfield
Ash rate: 2.5 t/h
Ash rate max: 10 t/h
Burned fuel: Coal
Boiler manufacturer: MHI

Dry Bottom Ash Handling in PCF Power Plants

1994 Chile EDELNOR MEJILLONES #1

Unit size: 150 MWe
Project type: Greenfield
Ash rate: 3 t/h
Ash rate max: 4 t/h
Burned fuel: Coal
Boiler manufacturer: B&W

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 Italy ENEL FUSINA #4

Unit size: 320 MWe
Project type: Retrofit
Ash rate : 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 USA FLORIDA POWER CORP. CRYSTAL RIVER #2

Unit size: 500 MWe
Project type: Retrofit
Ash rate : 4.5 t/h
Ash rate max: 25 t/h
Burned fuel: Coal
Boiler manufacturer: ALSTOM

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1993 Italy ENEL FUSINA #3

Unit size: 320 MWe
Project type: Retrofit
Ash rate : 4 t/h
Ash rate max: 8 t/h
Burned fuel: Coal, co-firing of RDF
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1991 Italy ENEL FUSINA #2

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1991 Italy ENEL FUSINA #1

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

CASE STUDY
1991 Italy A2A MONFALCONE #2

Unit size: 160 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

1990 Italy ENEL BASTARDO #2

Unit size: 75 MWe
Project type: Retrofit
Ash rate : 1.5 t/h
Ash rate max: 2 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1990 Italy A2A MONFALCONE #1

Unit size: 160 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 3 t/h
Burned fuel: Coal, co-firing of biomass
Boiler manufacturer: C.E. / F. TOSI

Dry Bottom Ash Handling in PCF Power Plants

1989 Italy ENEL BASTARDO #1

Unit size: 75 MWe
Project type: Retrofit
Ash rate: 1.5 t/h
Ash rate max: 2 t/h
Burned fuel: Coal
Boiler manufacturer: B&W / ANSALDO

Dry Bottom Ash Handling in PCF Power Plants

1985 Italy ENEL PIETRAFITTA #2

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 10 t/h
Burned fuel : Lignite
Boiler manufacturer: DURR-WERKE

Dry Bottom Ash Handling in PCF Power Plants

1985 Italy ENEL PIETRAFITTA #1

Unit size: 35 MWe
Project type: Retrofit
Ash rate: 2 t/h
Ash rate max: 10 t/h
Burned fuel : Lignite
Boiler manufacturer: DURR-WERKE

Dry Bottom Ash Handling in PCF Power Plants

DISCOVER MORE