The first ultrasupercritical boilers installed in Turkey will feature Magaldi’s technology

A new milestone is set for the MAC® system: the first 2x660MW ultrasupercritical boilers to be installed in Turkey, owned by CENAL Elektrik Üretim A.Ş. and currently under erection in Karabiga on the Marmara Sea, will be equipped with our dry bottom ash handling system. Delivery of the equipment on site is planned for June 2016.