Magaldi signs a contract with Doosan HI

Today, 27th May 2009 at Power Gen Cologne exhibition, Magaldi Power S.p.A. has signed a contract with DOOSAN Heavy Industries & Construction Co. Ltd. for the supply of a dry ash extraction and cooling system for the 340 MW CFBC Boiler to be installed in Korea at Yosu Power Plant. The FLUIMAC® is the Magaldi innovative system for the dry extraction and cooling of bed ash from fluidized bed boilers. Mr. Mario Magaldi, President of Magaldi Power S.p.A. commented: “This contract, the 127th reference, the 4th in Korea, is confirming and consolidating Magaldi’s leadership in dry bottom ash extraction and cooling systems worldwide”.