A Swiss CHP Plant: dry waste slag handling retrofit

In October 2014, a Swiss leader in energy from waste (EfW) sector, acting as an engineering, procurement and construction (EPC) contractor, chose the patented Magaldi Ecobelt® WA (Waste Ash) conveyor for an Incinerator located close to Zuerich - Switzerland.

Replacing a wet Apron conveyor, the Magaldi Ecobelt® WA (to be installed at the beginning of 2015) will handle the slag directly from the combustion grate, cool and convey it in a complete dry mode.

The Magaldi Ecobelt® WA will be 40 degrees inclined and about 30 meters long. A scraper conveyor will remove the fine residuals from the bottom of the Magaldi Ecobelt® WA casing.