The first MAR® System was installed in June
2004 on Unit #1 in Monfalcone Power Plant (ENDESA Italia). Before
and after the installation, this system has continuously been
developed by MAGALDI. The MAC® System was installed on the same
Unit in 1992.
Because of the successful operation on the 1st
Unit in Monfalcone Power Plant, the MAR® system is now being
installed on Unit #2 too.