Hitachi Power Europe GmbH awarded Magaldi Power SpA for the supply of a MAC dry bottom ash system for their Electrabel 800 MW coal fired boiler, to be installed in Rotterdam (Netherlands).
This order, following other two awards made in the past two years from Hitachi to Magaldi, is confirming the strong interest of the north european markets to our MAC dry bottom ash technology, which is now serving more than 45 GW of installed power worldwide.